Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The idea here is to validate that the Release Candidate being checked qualifies for AT LEAST the Minimum Viable Product while understanding that bugs/issues that are known may not be resolved, but have been acknowledged, addressed, or at least documented in Jira.

These are the validation steps for QA to ensure that MVP functionality has been checked on any Health Authority integrated release.

  1. General Validation Test

  2. Interface Check

  3. Upgrade Validation

  4. End-to-End Test (if not already completed in the General Validation Test)

  5. Ad Hoc Verification of any systems not already viewed

Showstopper bugs should be communicated directly, rather than input to Jira. If possible message in Slack, or what ever immediate communication format that is currently being used.