Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

A manually updated dashboard showing overall testing status for MVP1. This is intentionally high-level. For details see Jira, Practitest, Detailes Test Reports, or ask on Slack (#testing, or one of the Scrumt Team channels)

If info here does not match what you believe is the case, what you see in Jira etc. (and the difference can’t be accounted for by the “last updated” timestamp, please have a conversaton with Diarmid Mackenzie or Adam Leon Smith as this suggests a comms gap.

Colour coding is highly subjective, but roughly: green = on track, amber = off track, but with a correction plan in place, red = off track & no clear plan, grey = descoped

Link to MVP1 spreadsheet
Link to JIRA

Last updated: 10 June, 9am Eastern

MVP Story

Overall Status

Action needed

MVP1: GPS logging gaps

More-or-less done on Android. iOS with Guam Dev. No clear date/plan for iOS yet.

Clear iOS plan from Guam

MVP2: GPS accuracy

Deferred to Mercury - though there has been Android progress under MVP1.

MVP3: Encryption on device

Implemented and mostly tested

MVP4: Clarify limitations via copy

Status not clear: MVP spreadsheet suggests MVP4 descoped. Yet we have SAF-466 in progress, still not yet in test, and not tracked in an MVP Epic.

Clarify status & tracking of MVP4

MVP5: Feature Flags

Implemented, tested, all good.

MVP6: Clarify Exposure Notification

Scope & status unknown - no update since 29 May

Get clear plan from Guam

MVP7: Auto-subscription

Scope & status unknown - no update since 5 June

Get clear plan from Guam

MVP8: Improved user consents

Ready for Test. No blockers.

MVP9: Internationalization

Lots of work still in Progress - no clear date for delivery into test.

Get clear plan from Alpita

MVP10: Designate Privacy Policy in Settings

Ready for Test.

https://pathcheck.atlassian.net/browse/PLACES-350

MVP11: Safe Places UX

About 80% Ready for Test. I’m assuming there is a plan for the remaining 20%? (214, 327, 331, 332)

Get clear plan for 4 x remaining TO DOs (all currently unassigned)

MVP12: Manually enter points as CT

SAF-496 “duration” still outstanding

Get plan onf SAF-496 from Satoshi

MVP13: Load, edit, save aggregated data

PLACES-127 still to do.

Get clear plan on PLACES-127 (unassigned - so talk to Dan McCoy?)

MVP14: Configure Retention Policy

Ready for Test. But we need a decision on SAF-469. I’m assuming out of scope. Will be green when we make that decision.

Agree to descope SAF-469

MVP15: Publisher Tool

Ready for Test

https://pathcheck.atlassian.net/browse/PLACES-352

MVP16: Secure transmission of location data

Ready for Test

https://pathcheck.atlassian.net/browse/PLACES-348?atlOrigin=eyJpIjoiZGYwMTA4YTVmODNkNDA0Mjk4ZGE0MWNlY2M1MDNlZmMiLCJwIjoiaiJ9

MVP17: Scalability

Pagination & Hashing App code still not merged.

Get plan for this

MVP18: Encryption of Points of Concern

Comes along with MVP17

As per MVP17

MVP19: Efficacy measurement

Descoped

MVP20: Tunable GPS intersection logic

Comes along with MVP17

As per MVP17.
This item no longer in s/s - clarify why.

MVP21: Onboarding flows for HAs

Descoped. But weirdly SAF-481 is labelled MVP1#21 and refers to user onboarding not HA onboarding

Clarify & tidy up Jira or spreadsheet.

MVP22: Safe Paths → Path Check

Believe in Test, but marked BLOCKED

Check Jira status

  • No labels